Fridays with Vico Presents Swinerton Builders

 

Integrity. Innovation. Experience. Those are the three words that best describe Swinerton Builder’s commitment to project success. And perhaps, too, the three words to describe their progression in BIM capabilities over the past five years.

 

Enjoy this archived case study edition of Fridays with Vico where we explored four resort/hospitality projects through the eyes of Swinerton Builders.

 

Who:  Swinerton Builders
What: Lessons Learned along the Path to 5D BIM

How: Use the form at the bottom of the page to download the webinar

 

We explore four case studies marking Swinerton’s progression from BIM novices to BIM experts.  Swinerton was one of the first adopters of Vico Services, the branch of our business dedicated to introducing our software solutions to project teams, providing complete peer review and best practice recommendations. Today, Swinerton Builders are modeling experts who have translated their BIM knowledge into complete IPD services for Owners.

 

The first case study features the Ritz Carlton Highlands Lodge, Resort and Spa in Lake Tahoe. This project covered over 406,500 square feet with luxury condominiums and a five-star resort hotel. Swinerton and their partner, Q&D Construction, introduced the Vico Services Team into the equation early in the design development phase. Working closely with the designers and subcontractors, the Team created a detailed 3D model to serve as the “moderator” for all preconstruction meetings. This BIM was enriched with MEPF models, structural, and architectural models. Next was simply working through the constructability report: resolving clashes and discrepancies, and starting to think through the schedule. The Team was so successful in working together with the model that Vico Services was able to exit the project having trained the Project Engineer to serve as the model manager.

 

 

Next, Swinerton shares information from The Denver Four Seasons. On this particular project, the virtual design and construction manager took a unique approach to incorporating job site considerations. Swinerton will discuss some of the requirements necessary for successful job-site integration of BIM. On this project, Swinerton focused on using BIM for ensuring a high level of coordination between the trades, and eliminating as many change orders as possible. They were also able to use the model information for fabrication, which assisted in timely (coordinated) material delivery to the jobsite. As you can imagine, this was a highly-congested downtown area, where effective product-delivery is critical.

 

The San Diego Hilton represents a unique approach to IPD. Swinerton took the leadership role, introducing their BIM philosophy to the Owner early in the design stage. According to Swinerton’s own quarterly newsletter, “The guiding principles are shared responsibility, ownership and project advocacy.”  Even the Owner challenged the team to push the envelope on new technologies and approaches.

 

This is an interesting design project as well: one facility houses two distinct Hilton brands - a Garden Inn and a Homewood Suites. And it turned out to be a perfect project for utilizing the BIM as a facilitator. Not only can the model express the Architects’ design intent, but also illuminate construction coordination. In weekly coordination meetings, issues could be resolved in real time that kept the project moving quickly. This is one project where the Swinerton team represents the standard for partnership and forward-thinking in the construction industry.

 

The Valley View Casino is still yet another interesting case study. Dubbed as the first luxury casino hotel in San Diego, the pressure was on for Swinerton to deliver unparalleled project delivery. We’ll see how Swinerton Builders carefully planned this project with detailed modeling of the site excavation and complex shoring scenarios for the hillside hotel. Again, Swinerton was able to introduce other project stakeholders to the benefits of modeling to achieve buy-in and collaborative project planning.

 

Who:  Swinerton Builders
What: Lessons Learned along the Path to 5D BIM

How: Use the form at the bottom of the page to download the webinar

 

If you are interested in building up your department like Swinerton, please check out these resources on the subject:

 

Blog: 5 Pieces of Advice for GCs Considering BIM

Blog: The BIM Washers Versus the Real Deal

Blog: Talk the Talk AND Walk the Walk with BIM

Blog: Differentiating Your Firm with 5D BIM

Blog: BIM Doesn't Come in a Box

Blog: 5D BIM Versus 50-Yard Line Tickets

Webinar: The BIM Master Class Series

Webpage: The D's of BIM

Paper: The 5D BIM Checklist

 

To see other Customer Case Study webinars, please watch:

 

WebinarPCL (10 case studies)
Webinar Hensel Phelps (Denver Justice Center)
Webinar Suffolk Construction (Torrey Pines Research Lab)
Webinar: Webcor and the Model Progression Specification
Webinar: St. Joseph Mission Hospital Virtual Mock-Up

Webinar: No Change Orders at St. Jude

Webinar: Hoar Construction and the Customer Success Plan

 

See highlights of this Fridays with Vico episode on the video clip below. If the content is meaningful to you and your BIM Team, please use the form at the bottom of the page to download the webinar.

 

 

System Requirements
PC-based attendees:
Windows® 2000, XP Home, XP Pro, 2003 Server, Vista
 
Macintosh®-based attendees:
Mac OS® X 10.4 (Tiger®) or newer

 

 

Select Recorded Webinars

Introducing Vico Office

February 20, 2009

 

The McGraw-Hill BIM SmartMarket Report

February 13, 2009

 

Suffolk Construction and the Torrey Pines Project

January 30, 2009

 

Hensel Phelps and the Denver Justice Center

January 23, 2009

 

Trimble and Vico - Bringing BIM to the Field

January 16, 2009

 

Webcor Builders and the Model Progression Specification

December 19, 2008

 

St. Joseph's Mission Hospital Virtual Mock-Up Case Study

November 14, 2008

 

Vico's Win the Deal Bundle

November 7, 2008

 

Vico for Concrete: Lift Drawings and More

Oct 17, 2008

 

Vico 101: An Introductory Webinar for Virtual Construction

Oct 13, 2008

 

Virtual Construction with the PCL Family of Companies

Sept 25, 2008

 

Orchestrating BIM the Vico Way

August 15, 2008 

 

 

 

Swinerton Case Study