Reporting in Vico Office
Owners tell us all the time how much they appreciate the reporting capabilities in Vico Office. After all, they are paying a tremendous amount of money and expect to get their building on-time and on-budget. The reports they get out of Vico Office let them monitor the project – without being a construction expert – and see the economic impact of each decision.
General Contractors want to provide the best experience possible to their Owners – and they tell us, too, that the reporting features in Vico Office are exceptional. Being able to see the whole project, not just departmental reports strung together, allows more project scrutiny and control. Simply put, the reporting capabilities in Vico Office de-risk your project with visibility, oversight, and better decision making.
During the next Fridays with Vico session, we’ll dive into the Vico Office Reporting Engine and highlight its capabilities. You’ll want to add this webinar to your calendar if your team is interested in providing this new standard of care for Owners and creating your own project dashboard across your different offices.
| Who: |
Fridays with Vico |
| Topic: |
Reporting in Vico Office |
|
When: |
Available 24/7 for your convenience |
|
What: |
A free online webinar series |
|
How: |
Use the form below to download the archived webinar |
What makes Vico Office reporting different than the standard reports you do currently? First, it is important to note that Vico Office is a database which collects coordination information, cost planning figures, scheduling data, and production control numbers from the jobsite. Second, with Vico Office, you can compare any two points in time: project costs, schedules, quantities, constructability; and easily show what has changed between these two dates. Third, let’s point out that the Reporting Engine harnesses ALL data from ALL projects making it easy to compare and contrast multiple projects from your portfolio from all your offices.
So imagine the flexibility of creating any type of report, including charts and graphs, customizable to your existing report types with logos, colors, fonts, etc., with all the fields of Vico Office at your disposal. During this webinar, we’ll show you how to create:
• Constructability Reports which organize issues with snapshots of the 3D clash and
the 2D drawing;
• Quantity Takeoff Reports with the total quantities per takeoff item;
• Quantity Takeoff per Locations Report looks at how materials are consumed across
the jobsite;
• Project Cost Reports for estimates, cost variance, etc.;
• Visual Budget Reports show the current state of the project versus the target cost;
• Flowline Reports are a visual representation of the schedule illustrating crews by
location by date along with their productivity rates;
• Cost- and Resource-Loaded Schedules are the perfect vehicle for communicating
with the Owner;
• Resource Histograms indicate the allocation of crews across a project site;
• Control Charts are a simple way to monitor the percent complete for various trades;
• Cash Flow Reports can be produced at any time during construction.
This webinar is for you and your team if you want to:
• Present multiple options to your Owners along with their budget and schedule
impacts;
• Keep all project stakeholders informed of progress and alert them when critical
decisions need to be made;
• Create a better Owner experience with comprehensive project reports.
| Who: |
Fridays with Vico |
| Topic: |
Reporting in Vico Office |
|
When: |
Available 24/7 for your convenience |
|
What: |
A free online webinar series |
|
How: |
Use the form below to download the archived webinar
|
See highlights of this Fridays with Vico episode on the video clip below. If the content is meaningful to you and your BIM Team, please watch the entire archived movie via the link above.
Video Caption: Vico delivers standard reporting templates for your team along with Vico Office so you can start creating construction management reports from Day 1. This video illustrates how to customize a simple Cost Plan template to include charts, graphs, and even project locations. Report Editor gives you the flexibility to report upon every field/every value in the Vico Office project database; so even though this video looks at Estimating Reports, you can imagine the same level of detail for Constructability Reports, Schedule Reports, and Production Control Reports.
Learn from your peers with your peers at Fridays with Vico.
To learn more about Reporting in Vico Office, please review the following materials:
Video Training Series: Using Report Editor
Video Training Series: Cost Planner
Video Training Series: Schedule Planner
Video Training Series: Production Controller - coming soon!
Frequently Asked Questions: Reporting in Vico Office
System Requirements PC-based attendees: Windows® 2000, XP Home, XP Pro, 2003 Server, Vista |
| |
Macintosh®-based attendees: Mac OS® X 10.4 (Tiger®) or newer |
Select Recorded Webinars
|
Steps to a Better BIM
Archived and available for your convenience 24/7
|
|
What Is Your Firm's BIM Score?
Archived and available for your convenience 24/7
|
|
The CIO’s Role in the BIM Strategy
Archived and available for your convenience 24/7
|
|
4D BIM Scheduling with Vico Office
Archived and available for your convenience 24/7
|
|
Utilizing the LBS in the 5D Workflow
Archived and available for your convenience 24/7
|
|
Using the Model Progression Specification
Archived and available for your convenience 24/7
|
|
An Introduction to LBMS and LPS
Archived and available for your convenience 24/7
|
|
The New Preconstruction
August 6, 2010
|
|
An Introduction to Model-Based Estimating
June 23, 2010
|
|
Introduction to Vico Office Constructability Manager
March 17, 2010
|
|
What You Need to Know Today about Seismic BIM
March 12, 2010
|
|
The Business Value of BIM
January 29, 2010
|
|
Taking BIM to the Enterprise
January 15, 2010
|
|
BIM Knowledge Base of Cost and Time Elements
December 11, 2009
|
|
Mastering Coordination and Constructability in a Hard Bid
November 13, 2009
|
|
Mastering the 5D Cost Plan in a Hard Bid
October 16, 2009
|
|
Vico Office Unplugged
October 2, 2009
|
| Scheduling Strategies in a Hard Bid Environment
September 11, 2009
|
|
Tracking Changes in Construction Drawing Sets
August 21, 2009
|
|
Introducing BIM for Executives
August 7, 2009
|
|
Vico Office for Preconstruction and Estimating Teams
July 17, 2009
|
| Connecting the Conceptual Estimate to the MPS
June 26, 2009
|
|
BIM 501: Model-Based Estimating
May 15, 2009
|
| BIM 401: Model-Based Scheduling
May 1, 2009
|
|
BIM 301 Webinar: New Contract Language
April 17, 2009
|
|
BIM 201 Webinar: 3D/4D Coordination
April 3, 2009
|
|
BIM 101 Webinar
March 20, 2009
|
|
Swinerton Builders
February 27, 2009
|
|
Introducing Vico Office
February 20, 2009
|
|
The McGraw-Hill BIM SmartMarket Report
February 13, 2009
|
|
Suffolk Construction and the Torrey Pines Project
January 30, 2009
|
|
Hensel Phelps and the Denver Justice Center
January 23, 2009
|
|
Trimble and Vico - Bringing BIM to the Field
January 16, 2009
|
|
Webcor Builders and the Model Progression Specification
December 19, 2008
|
|
St. Joseph's Mission Hospital Virtual Mock-Up Case Study
November 14, 2008
|
|
Vico's Win the Deal Bundle
November 7, 2008
|
|
Vico for Concrete: Lift Drawings and More
Oct 17, 2008
|
|
Vico 101: An Introductory Webinar for Virtual Construction
Oct 13, 2008
|
|
Virtual Construction with the PCL Family of Companies
Sept 25, 2008
|
|
Orchestrating BIM the Vico Way
August 15, 2008
|