Model-based scheduling involves the optimal sequencing of tasks and trades, procurement and lead times by using productivity rates and crew sizes. The theory of flowline scheduling describes the optimization process with a location-based schedule. It calculates the optimal sequence and flow of trades through the various locations of the building project. 

 

This service from Vico's Professional BIM Consulting team deploys a best in class, location-based technique using the quantities derived from the Virtual Construction model (the 4D BIM). This method helps to solve interference problems between subcontractors, thus directly reducing costs and compressing the schedule without increasing risk.

 

The result is an efficiently-built project, sans the usual stops and starts, overcrowding of trades in various locations, accurate activity durations based on quantities and locations, materials availability matched to location and productivity, and effective production control. The subs completely understand where they're going, what they're doing, and how quickly they need to progress. This predictability leads to better pricing, better quality, more proactive management, and a safer work environment.

 

On-site production control provides real-time reaction to a schedule disruption and actively prevents cascading delay chains. 

 

For more information on model-based scheduling, please peruse the following resources:

BIM 401: Model-Based Scheduling

Scheduling Strategies in a Hard Bid

Fit and Finnish Blog

 

To learn more about the software that powers this Service Offering, please review Vico Control.  To learn more about the Service Team deliverables, please click through the panes below.

Conversion
Get the Flash Player to see this player.

 

A simulation of the construction sequence will be created. based on the client’s schedule for analysis and presentation purposes. The format will be delivered as an AVI movie and as an interactive simulation.

 

Includes:

• Standard schedule conversion

• Analysis Report

• 4D Presentation File

• Recommendations

Optimization

 

Includes:

• Advanced Schedule Conversion

• Optimized Location Breakdown Structure

• Optimized WBS

• Model-based Schedule Optimization

• Resource Continuity for Each Subcontractor

• Maximized Productivity

• Optimized Location Utilization

• Minimization of Trade Conflicts

• Task Sequence Based on Existing Logic in Client Schedule

• Gantt Chart Print

• Flowline Prints

• Network View Print

• Resource Histogram Print

• 4D Presentation File

• Schedule Assumption Report

Creation

The Client’s activity-based construction schedule will be used as the base input for the creation of a location-based schedule, and expert assumptions will be made and recorded throughout the conversion process.

 

 

Model-Based Quantity Take Off

Model-based quantities are generated based on the client’s classification system and the location breakdown structure defined in the model.

 

 

Flowline Schedule

Vico Construction Services will work with the client, and the client’s subcontractors, to define the construction methods and logic. This input, along with the location-based quantities, productivity rates, and crew sizes (if available), will be used to develop an optimized Flowline schedule.

 

This text will be replaced

 

4D Construction Simulation

A simulation of the construction sequence will be created based on the optimized schedule for analysis and presentation purposes. The format will be delivered as an AVI movie and as an interactive simulation in Vico 5D Presenter.

Resource Histogram

 

Resource graphs and histograms graphically report the number of planned resources on site at any given time. Using the chart settings, the charts can be customized to deliver data on specific tasks or specific resources, thus graphically indicating how smooth the resource profile is.

On-site Production Control

 

Flowline Schedule for Production Control

Vico will work with Client’s Construction field team to track and monitor using location-based concepts. The Flowline schedule and location-based quantities will be updated based on design changes and changes in methods.

 

Forecast Delay Warning

A report will be created that flags when a subcontractor’s productivity rate fails to match the planned pace of construction. This option will be priced on a time and materials basis.

 

Example deliverables

• Task Micromanagement – Micromanagement – A Vico location-based schedule
  allows tasks to be managed on a higher level of accuracy

• This helps plan a consistently evolving 2-3-or 4-week look-ahead schedule

• Progress Collection

• Progress Entry

• Performance Reports – Production Control – Data are colected for project status
  updates

• Vico will perform a rigorous weekly project update. This update will show the
  forecast of what is likely to happen, based on the past performance of the project

• Resource Management

• Procurement Control

• Quality Control

• Forecasting

 

For more information about Vico services: