CPM Match: Translating Your Traditional Construction Schedule to a Location-Based Schedule
Given all that has been written about new projects being orchestrated with Location-Based Scheduling, how it stacks up to traditional CPM scheduling, and simple ways to transition from paper scheduling to 4D BIM scheduling, wouldn’t you like to see how your own schedules compare? Wouldn’t you like to see how the same deadlines can be met, with less risk to the project, and perhaps fewer resources, ergo costs?
Then take time out of your schedule (yes, pun intended) for the next Fridays with Vico webinar where we will explore CPM Match, a new service offering which translates your existing CPM schedule and introduces new location-based scheduling and forecasting techniques to your team.
|
What: |
CPM Match – A New Location-Based Scheduling Service |
|
When: |
Archived for your convenience |
|
Where: |
A free online webinar |
|
How: |
Use the form at the bottom of the page to download the archived webinar |
The CPM Match is a new service offering from Vico. In just two to four weeks, we translate your activity-based CPM schedule into a Location-Based schedule, complete with the easy-to-read Flowline view for successfully orchestrating trades. We also provide a fully-optimized schedule alternative so you can compare and contrast the two approaches. We also include Optimization Workshops for your team to review the basic tenets of Location-Based Scheduling. During this workshop, your team will apply various optimization techniques to further refine the two schedule options.
Our goal is to illustrate how we can reach your completion date with fewer resources and less project risk. How does it work?
CPM Match Workflow
Step 1: Share existing CPM schedule and project models. In order to start work calculating the quantities by location, we will need the models from the project. If there aren’t any models available, we can develop them from the drawing sets. Or if some models exist, we can check them for quality and grade them for applicability for construction scheduling with our Quality Assurance and Refinement service. We will use the models to properly determine the Location-Breakdown Structure and Location Systems so we can derive the quantities per location.
Step 2: Past performance data from your subcontractors. If this is something you don’t have readily available, we can use our knowledgebase of productivity rates we’ve pulled together from over 400 Virtual Construction projects around the world.
Step 3: Durations. With quantities per location and productivity rates in hand, we can calculate task durations. Based on your CPM Schedule end date, we’ll determine the number of resources required to achieve the planned schedule and analyze the flow, balance, production of those resources within each construction phase. We will also produce a version of the schedule with optimized resource flow and balance, aligned to the major phase milestones, to review with the team during an Optimization Workshop.
Step 4: Collaborative Schedule Optimization Workshop. With the new findings in hand, we walk your team (Planners, Superintendents, PEs, BIM Managers, etc.) through the tenets of Location-Based Scheduling: namely, that subcontractors work at optimum productivity with optimum safety and craftsmanship if their location is free of unnecessary materials and other crews. In order to illustrate these principles, we walk through several optimization techniques and their budget/time consequences on the project.
During the second half of the workshop, we look specifically at the CPM Match Schedule and the Optimized Alternative. As a team, we investigate the durations and logic, as well as compare the resource continuity, resource levels, production rates, and sequence.
We finish up the workshop by applying different optimization techniques to further refine the schedule and see the implications to budget and timeline.
Step 5: Your Team Reviews the Findings. We deliver a list of improvement suggestions and allow your team to determine the best course to follow. You can choose to implement the suggestions in your CPM schedule or decide to move forward with the Vico Schedule and learn production control best practices to manage to the schedule on-site.
Step 6: Optional Production Control Workshop. Should you elect to move forward with the location-based Vico Schedule, we will conduct another workshop with your team to review Production Control basics. Perhaps you already do many of these practices such as reporting work put in place on a weekly basis and supplementing it with actual crew sizes and actual quantities. Together we will see how these numbers are calculated into the Forecast Schedule and indicate where a problem might arise. We can then apply more optimization techniques to eliminate the problem before it ever rears its head.
Step 6: Optional Peer Review Production Control. Now that your team has the new location-based scheduling skills to manage the project on-site, we take a back seat simply provide coaching when necessary. Every week we will help your team incorporate the site walk statistics into your forecast schedule, make any adjustments, share any insights with the subs with schedule simulations, and organize Owner reports and deliverables.
At the end of the CPM Match engagement, you will find that:
A. coordinating the subs according to pace of production is actually easier than
managing to start date;
B. weekly site walks and properly recording work put-in-place, actual crew size, and
actual quantities prevents problems from escalating;
C. communicating tasks per location is easier with visual simulations;
D. location-based scheduling is more precise in both the planning and production
control phases;
E. you are ready to fly solo on your next project!
This webinar is for you and your team if:
• You are interested in a better way of managing projects – one that hinges on factual
data instead of late-game heroics;
• You want to leverage the power of BIM models to more accurately schedule and
price your projects, not to mention, bringing them home on-time and on-budget;
• You want to offer your Owners more comprehensive reporting options such as cost-
and resource-loaded scheduling, resource histograms by labor, material, and
equipment, costs per location, project cash flow, and all contractual obligations for
schedule reporting.
This is one of those webinars where you want the whole team assembled – so please forward this invitation around. Even if you can’t make the date/time, register now and you’ll receive a link to the archived webinar which you can watch at your convenience.
|
What: |
CPM Match – A New Location-Based Scheduling Service |
|
When: |
Archived for your convenience |
|
Where: |
A free online webinar |
|
How: |
Use the form at the bottom of the page to download the archived webinar |
See highlights of this Fridays with Vico episode on the video clip below. If the content is meaningful to you and your BIM Team, please use the form at the bottom of the page to download the archived webinar.
Learn from your peers with your peers at Fridays with Vico!
System Requirements PC-based attendees: Windows® 2000, XP Home, XP Pro, 2003 Server, Vista |
| |
Macintosh®-based attendees: Mac OS® X 10.4 (Tiger®) or newer |
Select Recorded Webinars
|
Detailed Scheduling and Estimating with Concept Stage SketchUp Models
Archived and available for your convenience 24/7
|
|
Cost Saving Strategies for BIM Staffing
Archived and available for your convenience 24/7
|
|
Real-Time Modeling and Coordination Services
Archived and available for your convenience 24/7
|
|
5D Data Pack | Virtual Construction Toolkit
Archived and available for your convenience 24/7
|
|
The Model Progression Specification 3.0
Archived and available for your convenience 24/7
|
|
Coordination Resolution
Archived and available for your convenience 24/7
|
|
Reporting in Vico Office
Archived and available for your convenience 24/7
|
|
Steps to a Better BIM
Archived and available for your convenience 24/7
|
|
What Is Your Firm's BIM Score?
Archived and available for your convenience 24/7
|
|
The CIO’s Role in the BIM Strategy
Archived and available for your convenience 24/7
|
|
4D BIM Scheduling with Vico Office
Archived and available for your convenience 24/7
|
|
Utilizing the LBS in the 5D Workflow
Archived and available for your convenience 24/7
|
|
Using the Model Progression Specification
Archived and available for your convenience 24/7
|
|
An Introduction to LBMS and LPS
Archived and available for your convenience 24/7
|
|
The New Preconstruction
August 6, 2010
|
|
An Introduction to Model-Based Estimating
June 23, 2010
|
|
Introduction to Vico Office Constructability Manager
March 17, 2010
|
|
What You Need to Know Today about Seismic BIM
March 12, 2010
|
|
The Business Value of BIM
January 29, 2010
|
|
Taking BIM to the Enterprise
January 15, 2010
|
|
BIM Knowledge Base of Cost and Time Elements
December 11, 2009
|
|
Mastering Coordination and Constructability in a Hard Bid
November 13, 2009
|
|
Mastering the 5D Cost Plan in a Hard Bid
October 16, 2009
|
|
Vico Office Unplugged
October 2, 2009
|
| Scheduling Strategies in a Hard Bid Environment
September 11, 2009
|
|
Tracking Changes in Construction Drawing Sets
August 21, 2009
|
|
Introducing BIM for Executives
August 7, 2009
|
|
Vico Office for Preconstruction and Estimating Teams
July 17, 2009
|
| Connecting the Conceptual Estimate to the MPS
June 26, 2009
|
|
BIM 501: Model-Based Estimating
May 15, 2009
|
| BIM 401: Model-Based Scheduling
May 1, 2009
|
|
BIM 301 Webinar: New Contract Language
April 17, 2009
|
|
BIM 201 Webinar: 3D/4D Coordination
April 3, 2009
|
|
BIM 101 Webinar
March 20, 2009
|
|
Swinerton Builders
February 27, 2009
|
|
Introducing Vico Office
February 20, 2009
|
|
The McGraw-Hill BIM SmartMarket Report
February 13, 2009
|
|
Suffolk Construction and the Torrey Pines Project
January 30, 2009
|
|
Hensel Phelps and the Denver Justice Center
January 23, 2009
|
|
Trimble and Vico - Bringing BIM to the Field
January 16, 2009
|
|
Webcor Builders and the Model Progression Specification
December 19, 2008
|
|
St. Joseph's Mission Hospital Virtual Mock-Up Case Study
November 14, 2008
|
|
Vico's Win the Deal Bundle
November 7, 2008
|
|
Vico for Concrete: Lift Drawings and More
Oct 17, 2008
|
|
Vico 101: An Introductory Webinar for Virtual Construction
Oct 13, 2008
|
|
Virtual Construction with the PCL Family of Companies
Sept 25, 2008
|
|
Orchestrating BIM the Vico Way
August 15, 2008
|