Coordination Strategies in a Hard Bid Scenario
In an environment where there are smaller projects with plenty of bidders under a hard bid edict, it’s imperative that you remain competitive. How can you better understand the project before you enter your bid?
Vico Services, the professional BIM consulting arm of Vico Software, has developed a new methodology for coordination of time and space based on our experience with over 400 global 5D BIM projects.
Mastering Coordination and Constructability in a Hard Bid
Use the form at the bottom of the page to download the archived webinar.
It’s easy to think that you’re done with BIM after you’ve run a clash detection. But in actuality, the true BIM has just begun. Not only do you need to organize objects in space, but you also have to organize the project timeline. These RFIs turn into Change Orders which greatly impact the duration and cost of your project. We’ll illustrate how to best manage the coordination process to iron out constructability and scheduling issues earlier rather than later.
When we hear the word “clash,” we are more likely to think about pipes running into HVAC cutting through a floor. That certainly is one very important definition. But Vico proposes there are many other types of clashes. We’ll look specifically at misalignment issues discovered on paper and resolved in the 3D model. Then we’ll take a look at scheduling clashes: too many crews in the same space and crew size/duration issues that lead to conflicts. Leveraged integration of coordination creates more opportunities to develop a better bid and a better schedule - true differentiators in a hard bid world. And Vico Service's proprietary coordination resolution by location has been documented to cut the clash detection cycles by 40%, leaving more time to develop shop drawings and prefabricate more components off-site.
This webinar is for you and your firm if:
>> Hard bids have become the de facto bidding process in your market;
>> You want to develop hard bid strategies quickly, but might not have time to
develop a BIM;
>> You know you’ll discover change orders during the project, but you want to
find them sooner;
>> You understand that coordination is more than polygonal clash detection;
>> You want to learn from a Services Team who has run over 300 successful
coordination projects, from the first drawing to the final brick.
>> You understand that good software is critical, but best practices distinguish you from the other bidders; and constructability analysis versus clash detection is key.
Learn from your peers with your peers at Fridays with Vico.
Learn more about this important step in the BIM workflow:
Blog: Coordination Resolution is 40% Faster than Traditional Clash Detection
Blog: Rethinking 3D BIM Coordination
Webinar: BIM 201: Clash Detection and Coordination
Webinar: Coordination 2.0 with Vico Office Constructability Manager
Webinar: The New Preconstruction
Webinar: Coordination Resolution - a Lean Approach to Clash and Coordination
Service: Quality Assessment and Refinement for BIM Models
Service: Coordination Resolution
Blog: Coordination Resolution Is 40% Faster than Traditional Methods
Webpage: What Is Clash Detection and Coordination?
Outputs and Deliverables: 2D Installation Drawings
Outputs and Deliverables: 6D BIM Models for Facilities Management
Product: Constructability Manager, Features and Benefits, FAQs
See highlights of this Fridays with Vico episode on the video clip below. If the content is meaningful to you and your BIM Team, please use the form at the bottom of the page to download the entire webinar.
System Requirements PC-based attendees: Windows® 2000, XP Home, XP Pro, 2003 Server, Vista |
| |
Macintosh®-based attendees: Mac OS® X 10.4 (Tiger®) or newer |
Select Recorded Webinars
|
Mastering the 5D Cost Plan in a Hard Bid
October 16, 2009
|
|
Vico Office Unplugged
October 2, 2009
|
| Scheduling Strategies in a Hard Bid Environment
September 11, 2009
|
|
Tracking Changes in Construction Drawing Sets
August 21, 2009
|
|
Introducing BIM for Executives
August 7, 2009
|
|
Vico Office for Preconstruction and Estimating Teams
July 17, 2009
|
| Connecting the Conceptual Estimate to the MPS
June 26, 2009
|
|
BIM 501: Model-Based Estimating
May 15, 2009
|
| BIM 401: Model-Based Scheduling
May 1, 2009
|
|
BIM 301 Webinar: New Contract Language
April 17, 2009
|
|
BIM 201 Webinar: 3D/4D Coordination
April 3, 2009
|
|
BIM 101 Webinar
March 20, 2009
|
|
Swinerton Builders
February 27, 2009
|
|
Introducing Vico Office
February 20, 2009
|
|
The McGraw-Hill BIM SmartMarket Report
February 13, 2009
|
|
Suffolk Construction and the Torrey Pines Project
January 30, 2009
|
|
Hensel Phelps and the Denver Justice Center
January 23, 2009
|
|
Trimble and Vico - Bringing BIM to the Field
January 16, 2009
|
|
Webcor Builders and the Model Progression Specification
December 19, 2008
|
|
St. Joseph's Mission Hospital Virtual Mock-Up Case Study
November 14, 2008
|
|
Vico's Win the Deal Bundle
November 7, 2008
|
|
Vico for Concrete: Lift Drawings and More
Oct 17, 2008
|
|
Vico 101: An Introductory Webinar for Virtual Construction
Oct 13, 2008
|
|
Virtual Construction with the PCL Family of Companies
Sept 25, 2008
|
|
Orchestrating BIM the Vico Way
August 15, 2008
|