Fridays with Vico Presents Vico Office

 

Thank you for your interest, but this webinar has been removed from circulation to make way for newer titles! 

 

Since this webinar first aired we have added a tremendous breadth of functionality to the solution. You can watch the evolution of Vico Office functionality with the following webinars...

 

1. For more detailed information on Vico Office for Estimating Teams, please watch the BIM-Based Estimating Fundamentals webinar.

 

2. To see how clash detection and constructability analysis fit into the 5D workflow, please watch the Coordination 2.0 and The New Preconstruction webinars.

 

3. At Vico, we say that 5D comes before 4D. See what we mean by watching The 5D Virtual Construction Workflow webinar.

 

4. To see how Vico Office works for Scheduling Teams, please watch the Planning and Controlling the Schedule webinar.

 

If you are interested in learning more about establishing your own BIM department or growing it, please check out these resources on the subject:

Blog: 5 Pieces of Advice for GCs Considering BIM

Blog: The BIM Washers Versus the Real Deal

Blog: Talk the Talk AND Walk the Walk with BIM

Blog: Differentiating Your Firm with 5D BIM

Blog: BIM Doesn't Come in a Box

Blog: 5D BIM Versus 50-Yard Line Tickets

Webinar: The BIM Master Class Series

Webpage: The D's of BIM

Paper: The 5D BIM Checklist

 

We also offer a step-by-step guide to our 5D virtual construction workflow with video tutorials. These videos are just 2-5 minutes in length, but illustrate how to use a particular piece of functionality. You can access the video library index and view just what you need, or download the complete set of training videos.

 

 

Here is the original invitation to the February 2009 webinar:

 

Vico Office is the BIM-neutral platform that analyzes, organizes, and synthesizes Revit, Tekla, and ArchiCAD files. Simply publish to Vico Office from your favorite BIM-authoring tool, and the platform takes care of the rest!  There’s no file format to alter, no conversion, simply publishing.

 

The first step is a Quantity Takeoff based on the model geometry. Utilizing a patent-pending algorithm, Vico Office produces a listing of construction quantities which are then used to power the estimates and schedules. These construction-caliber quantities hold the key for accurate calculations throughout the project.

 

Why does this one step level the playing field? Vico Office adds a more granular set of building information to the building model through these construction quantities which is simply not needed nor available in the design environment. Now project stakeholders can participate in the BIM using their favorite tools. Quantities for construction can be quickly extracted, or for graphical users, painted into families for quick highlighting in the 3D model.

 

Inside the Excel-like interface, the user can explode a cell to expose the Formula Editor. Using the Formula Editor, the user can quickly access the multiple quantity types in the model and customize their specific calculations to account for consumption rates, waste factors, and escalations. Estimating is streamlined from the first conceptual estimate through the final GMP.

 

And because we’re working with an estimating and scheduling database, reports can be built on the fly to easily communicate project details.

 

Come see what everyone is talking about: Vico Office - the first BIM-neutral environment for model-based estimating and scheduling.

 

Pricing is available from your Vico Sales Team.

 

See highlights of this Fridays with Vico episode on the video clip below. If the content is meaningful to you and your BIM Team, please watch the entire archived movie via the link above.

 

 

 

System Requirements
PC-based attendees:
Windows® 2000, XP Home, XP Pro, 2003 Server, Vista
 
Macintosh®-based attendees:
Mac OS® X 10.4 (Tiger®) or newer

 

 

Select Recorded Webinars

The McGraw-Hill BIM SmartMarket Report

February 13, 2009

 

Suffolk Construction and the Torrey Pines Project

January 30, 2009

 

Hensel Phelps and the Denver Justice Center

January 23, 2009

 

Trimble and Vico - Bringing BIM to the Field

January 16, 2009

 

Webcor Builders and the Model Progression Specification

December 19, 2008

 

St. Joseph's Mission Hospital Virtual Mock-Up Case Study

November 14, 2008

 

Vico's Win the Deal Bundle

November 7, 2008

 

Vico for Concrete: Lift Drawings and More

Oct 17, 2008

 

Vico 101: An Introductory Webinar for Virtual Construction

Oct 13, 2008

 

Virtual Construction with the PCL Family of Companies

Sept 25, 2008

 

Orchestrating BIM the Vico Way

August 15, 2008