Vico offers many opportunities to learn and share the latest best practices and methodologies with virtual construction.  Please be sure to check out our Project Gallery, Testimonials, as well as all the customer case studies available as movies from the archived Fridays with Vico webinar series.

 

Video case studies include PCL (10 projects), Swinerton Builders (4 projects), Hensel Phelps (the Denver Justice Center, Suffolk Construction (a before and after BIM comparison), Webcor Builders (and their use of the model progression specification), and St. Joseph Health System (the Mission Hospital project).

 

All these companies, and many more, share their insights in the Vico LinkedIn User Group.  Please join the discussion and let's propel BIM's adoption together!

 
Mission Hospital - St. Joseph

The Mission Hospital - St. Joseph Health System

The Mission Hospital Patient Care Tower in Mission Viejo, California is 4 stories over a basement for a total of 94,176 square feet. The Basement includes a central plant, tunnel to the existing tower, and a shelled space.

read more...

 
QDZ Ritz Carlton

SRV Group - Kamppi Center Project, Finland

Using Vico Software Control, and with support from Vico Software Construction Services, the SRV Group was able to deliver a large scale project six months ahead of schedule!

read more...

 
QDZ Ritz Carlton

QDS - Ritz Carlton Highlands Lodge, Resort and Spa, USA

Vico Software's 5D products and services enabled Q&D/Swinerton (QDS) to coordinate between different trades, conduct effective communication, and save time and costs by running detailed constructability analyses.

read more..

 

Oy Alfred A. Palmberg Ab - Varma Salmisaari Project, Finland

Vico Software’s Virtual Construction™ Services team provided the Palmberg Group, Salmisaari project's general contractor, a detailed, highly accurate, model-based estimating, optimized location based project schedule, and an in depth constructability analysis report.

read more..

 

Applecross Properties Ltd. - Queen Margaret Drive Project, UK

Vico Software's 5D technology allowed Applecross to identify and solve 185 constructability issues in the pre-construction stage in order to eliminate on-site errors.

read more..