Steps to a Better BIM
There has been a fascinating discussion on the BIM Experts LinkedIn Group for three weeks about the differences between a Design-Intent Model and a Construction Means and Methods Model. Many, many people have weighed in with their experiences from the field, but the question still remains, "Can a design model evolve into a construction model, or is it better for the constructors to build a new Construction BIM?"
This has been the promise of Vico Office - that one day we will be able to accept models from each party (the architect, the subs, and the GC) and use them as-is. We have come very far over the past seven years and are very close to the goal. Model fidelity can be improved greatly, but we are still not ready to say that any BIM model can produce meaningful data for downstream applications like coordination, scheduling, estimating, and production control on-site.
And how can an Owner know the difference between a model which will work and a model which will not? So we have developed a new service for owners, architects, subs and GCs to interrogate their models and ensure that they are meaningful for every member of the team.
Come learn more about this new service offering which you can use on your next project. We’ll explain the methodology and protocols we use to inspect the model and show examples from commonly mis-modeled elements.
| Who: |
Fridays with Vico |
| Topic: |
Quality Assurance and Refinement for BIM Models |
|
When: |
Available 24/7 for your convenience |
|
What: |
A free online webinar series |
|
How: |
Use the form below to download the archived webinar |
The Model Quality Assurance and Refinement Service is performed on all Archicad, Revit, and Tekla models. The Service takes the model and the current drawing set as input and creates an assessment of the model focusing on its suitability for use in the Virtual Construction Management process.
If problems are found with the model that the customer would like repaired, Vico QAR Service provides a fixed price proposal for performing the needed work in collaboration with the General Contractor, thus ensuring the model meets the strict project requirements. Or you and your team can take the quality report and a template content plan and repair or add to the model as needed.
This webinar is important for your team if you:
1.) Are involved in construction projects where a BIM model is going to be used after the Design stage;
2.) Are involved in projects where models will come from multiple sources and you want independent Quality Assurance checks of the models from the various parties;
3.) Want to learn more about Quality Assurance protocols for Design Team models which you want to use for 4D and 5D;
4.) Want to learn more about the key differences between a design and construction model.
Gather your team for this informative session, the first of a four-part series on improving model fidelity for virtual construction.
| Who: |
Fridays with Vico |
| Topic: |
Quality Assurance and Refinement for BIM Models |
|
When: |
Available 24/7 for your convenience |
|
What: |
A free online webinar series |
|
How: |
Use the form below to download the archived webinar
|
See highlights of this Fridays with Vico episode on the video clip below. If the content is meaningful to you and your BIM Team, please use the form below to download the the archived webinar.
Learn from your peers with your peers at Fridays with Vico.
System Requirements PC-based attendees: Windows® 2000, XP Home, XP Pro, 2003 Server, Vista |
| |
Macintosh®-based attendees: Mac OS® X 10.4 (Tiger®) or newer |
Select Recorded Webinars
|
What Is Your Firm's BIM Score?
Archived and available for your convenience 24/7
|
|
The CIO’s Role in the BIM Strategy
Archived and available for your convenience 24/7
|
|
4D BIM Scheduling with Vico Office
Archived and available for your convenience 24/7
|
|
Utilizing the LBS in the 5D Workflow
Archived and available for your convenience 24/7
|
|
Using the Model Progression Specification
Archived and available for your convenience 24/7
|
|
An Introduction to LBMS and LPS
Archived and available for your convenience 24/7
|
|
The New Preconstruction
August 6, 2010
|
|
An Introduction to Model-Based Estimating
June 23, 2010
|
|
Introduction to Vico Office Constructability Manager
March 17, 2010
|
|
What You Need to Know Today about Seismic BIM
March 12, 2010
|
|
The Business Value of BIM
January 29, 2010
|
|
Taking BIM to the Enterprise
January 15, 2010
|
|
BIM Knowledge Base of Cost and Time Elements
December 11, 2009
|
|
Mastering Coordination and Constructability in a Hard Bid
November 13, 2009
|
|
Mastering the 5D Cost Plan in a Hard Bid
October 16, 2009
|
|
Vico Office Unplugged
October 2, 2009
|
| Scheduling Strategies in a Hard Bid Environment
September 11, 2009
|
|
Tracking Changes in Construction Drawing Sets
August 21, 2009
|
|
Introducing BIM for Executives
August 7, 2009
|
|
Vico Office for Preconstruction and Estimating Teams
July 17, 2009
|
| Connecting the Conceptual Estimate to the MPS
June 26, 2009
|
|
BIM 501: Model-Based Estimating
May 15, 2009
|
| BIM 401: Model-Based Scheduling
May 1, 2009
|
|
BIM 301 Webinar: New Contract Language
April 17, 2009
|
|
BIM 201 Webinar: 3D/4D Coordination
April 3, 2009
|
|
BIM 101 Webinar
March 20, 2009
|
|
Swinerton Builders
February 27, 2009
|
|
Introducing Vico Office
February 20, 2009
|
|
The McGraw-Hill BIM SmartMarket Report
February 13, 2009
|
|
Suffolk Construction and the Torrey Pines Project
January 30, 2009
|
|
Hensel Phelps and the Denver Justice Center
January 23, 2009
|
|
Trimble and Vico - Bringing BIM to the Field
January 16, 2009
|
|
Webcor Builders and the Model Progression Specification
December 19, 2008
|
|
St. Joseph's Mission Hospital Virtual Mock-Up Case Study
November 14, 2008
|
|
Vico's Win the Deal Bundle
November 7, 2008
|
|
Vico for Concrete: Lift Drawings and More
Oct 17, 2008
|
|
Vico 101: An Introductory Webinar for Virtual Construction
Oct 13, 2008
|
|
Virtual Construction with the PCL Family of Companies
Sept 25, 2008
|
|
Orchestrating BIM the Vico Way
August 15, 2008
|